More than 100 years
serving the industry
Life solutions
Energy solutions
Focus on
Our News

Detecting Deviations from CIP Standards: Preventing Caustic Soda Overconsumption Through Industrial Data, Track Advance® and Process Expertise
July 27, 2026
An unusual increase in caustic solution consumption was detected at a CIP station. Thanks to historical data in
OUR SOLUTIONS
For your markets and industries
Food
& Ingredients
Food
& ingredients
Discover
Brewery &
Distillery
Brewery &
Distillery
Discover
Cosmetics
& Hygiene
Cosmetics
& Hygiene
Discover
Pharma & Biotech
Pharma & Biotech
Discover
Energy
Nuclear
Energy
Nuclear
Discover
Advanced
Energies
Advanced
Energies
Discover
Oil
& Gas
Oil
& Gaz
Discover
Steel
& Mining
Steel
& Mining
Discover
Your projects
Our Achievements

Studies of cooling circuits as part of the refurbishment of the B Arcelor Mittal blast furnace in Ghent, Belgium.
ArcelorMittal in Ghent has 2 blast furnaces which are the heart of their production The blast furnaces operate for 20 to 25 years, after which the refractory lining must be renewed. Today it is the turn of blast furnace B to undergo such an operation.

Design, construction and commissioning of an injectables production unit
Boccard undertook the project to design and build a turnkey workshop fro injectables for a major player in the pharmaceutical markets

Monoclonal antibody (mAbs) production unit
Boccard was chosen for its expertise in monoclonal antibodies and disinfection as well as for its know-how in GMP design (good manufacturing practices).
Focus on
Our Expertise and Services
About
Boccard at a glance
You want
more information ?
Our Customers
They trust us














