Restart of the Arcelor Mittal Galati blast furnace in Romania

STEEL & MINING

The Romanian sheet and plate producer ArcelorMittal Galati called on Boccard teams to restart its number 5 blast furnace.

The relining which was carried out during the shutdown of the blast furnace aims to extend its life by 15 years .

Our teams thus ensured the complete EPC of the project including cooling and hydraulic systems, cooling box and tube rack .

Learn more about our solutions for industries
STEEL & MINING ?

Key points

12 months of intervention

Around 5,000 tonnes of steel and 3,000 tonnes of refractory materials were used for the blast furnace

265 kilometers of electrical cables were laid.

EQUIPEMENT AND SERVICES SUPPLIED

Our teams have been involved specifically in :

  • Cooling system: detailed engineering, fabrication, piping assembly, subcontractor management (lifting/insulation/CG)
  • Furnace itself
  • Furnace shell
  • Bell-less furnace
  • Cooling system with staves, cooling plates and jacket cooling
  • Hot wind systems
  • Cowpers
  • Hot wind duct
  • Circular duct