RMH: Where Tradition Meets Innovation – Carlsberg Huê Expansion
In the heart of Vietnam, in the city of Huê, Carlsberg took a bold step: expanding its brewery to become a symbol of modernity in the region. The challenge? Increase efficiency and introduce cutting-edge technologies in raw material handling while preserving the local character of production.

Design and construction of a new factory dedicated to the production of hair care products in Egypt
For a new Greenfield factory located near Cairo, this cosmetics company called on Boccard for its expertise in cosmetic installations.

Extension of a production plant for crepes and pastry doughs
Our teams designed, manufactured and implemented process solutions to increase the capacity of this American crepes and pastries factory.

Design of a new brewhouse for the Irish Distillers brand
Our expert teams proposed a Meurabrew continuous brewhouse concept to IDL, with a five-phase expansion program.

RMH: Bangkok Complete raw material handling plant
A leading brewery sought to modernize its raw material logistics for barley and malt, aiming for high throughput and strict compliance with international standards.

Prefabrication and installation of spools in record time for a refinery in Colombia
Our teams specialized in pipe prefabrication have produced more than 64,000 spools for a refinery in Colombia.

Prefabrication of piping for the construction of an ethylene plant in the United States
Prefabrication of 3,000 tons of piping for the cooling system on this project to expand a petrochemical complex in Texas.

Design and installation of a Greenfield greek yogurt factory in less than one year
Discover the success story of the Chobani yogurt plant in the United States. In less than a year, our teams designed, manufactured, installed and commissioned the world’s largest Greek yogurt plant, which was named “Plant of the Year”. A major greenfield factory project which

Turnkey cell culture plant in Malaysia
For this greenfield project, Boccard carried out the entire project with a “global contractor” approach, thus integrating civil engineering, clean rooms, as well as all production units.

Ice cream pop enrobing preparation line
We designed a line extension in the European plant of an American company: we were required to combine different construction and product standards. Boccard’s expertise in piping and dosing was determinant to meet the hygienic requirements of dairy processing.

Workshop for the purification of animal oil for Omega 3
Novasep, a service provider in the field of production and purification of molecules for the life sciences and the chemical industry, turned to Boccard for the development and industrialization of its processes to obtain new molecules. Boccard designed, constructed and commissioned this workshop in the largest chromatography purification plant in the world.

Expansion of the production capacities of a cosmetics factory
This plant-based cosmetics brand worked with Boccard to increase the production capacity of its factory in France.

Restart of the Arcelor Mittal Galati blast furnace in Romania
The Romanian sheet and plate producer ArcelorMittal Galati has called on Boccard’s teams to restart its blast furnace number 5.

Design and construction of a blood fractionation plant in Brazil
As part of a technology transfer between the French and Brazilian laboratory, Boccard was chosen as the supplier of the process equipment.

Turnkey plant for the manufacture of body and hair care products
On behalf of a Swedish company, Boccard built a turnkey plant dedicated to the production of body and hair care products in Russia.

Extension and revamping of a fresh cheese factory
Expanding a factory is limited by the space available. Our teams designed this new production line by rethinking the layout of the plant.

Construction of a new brewhouse for the Abbey “Trappistes de Rochefort”
The Abbey “Trappistes de Rochefort” wanted to design and construct its new brewhouse. They trusted in the expertise of our Belgian teams from Meura: a company from Boccard dedicated to brewery, distillery and grain extract projects.

Design, construction and commissioning of an injectables production unit
Boccard undertook the project to design and build a turnkey workshop fro injectables for a major player in the pharmaceutical markets

Prefabrication of pipes for Crescent Dunes Solar Energy
On this ambitious project, Boccard teams prefabricated more than 1200 tons of piping.
The new biomass power plant, with a power of 10MWe (40MWth), is located near the Petit-Saut dam in the commune of Sinnamary in French Guiana:

Studies of cooling circuits as part of the refurbishment of the B Arcelor Mittal blast furnace in Ghent, Belgium.
ArcelorMittal in Ghent has 2 blast furnaces which are the heart of their production The blast furnaces operate for 20 to 25 years, after which the refractory lining must be renewed. Today it is the turn of blast furnace B to undergo such an operation.

Soap manufacturing unit
In order to increase its production capacities, this company requested Boccard’s expertise to create a new automated production unit for anioxide soap.