Discover
Our achievements

Construction of a new brewhouse for the Abbey “Trappistes de Rochefort”
The Abbey “Trappistes de Rochefort” wanted to design and construct its new brewhouse. They trusted in the expertise of our Belgian teams from Meura: a company from Boccard dedicated to brewery, distillery and grain extract projects.

Extension of a production plant for crepes and pastry doughs
Our teams designed, manufactured and implemented process solutions to increase the capacity of this American crepes and pastries factory.

Prefabrication and installation of spools in record time for a refinery in Colombia
Our teams specialized in pipe prefabrication have produced more than 64,000 spools for a refinery in Colombia.

EPC fluid package for the Jules Horowitz experimental nuclear reactor
Boccard is in charge of the EPC Fluids lot: design, studies, implementation and start-up of the fluid systems.

Turnkey plant for the manufacture of body and hair care products
On behalf of a Swedish company, Boccard built a turnkey plant dedicated to the production of body and hair care products in Russia.

Manufacturing of piping modules for the cryogenic lines of the Large Hadron Collider of the European Council for Nuclear Research in Switzerland
CERN’s Large Hadron Collider (LHC) is a 27 km ring, buried to a depth of 100 meters, near the French-Swiss border in Geneva. It is the most powerful particle accelerateur in the world.
Turnkey food flavoring plant in the United States
We accompanied a long-standing partner in its opening to the American market. Boccard US has the know-how in turnkey plants and a deep knowledge of local standards, the ideal partner for this project.

Studies of cooling circuits as part of the refurbishment of the B Arcelor Mittal blast furnace in Ghent, Belgium.
ArcelorMittal in Ghent has 2 blast furnaces which are the heart of their production The blast furnaces operate for 20 to 25 years, after which the refractory lining must be renewed. Today it is the turn of blast furnace B to undergo such an operation.

Revamping of the SUEZ Rambervillers incineration unit (Vosges, France)
On this project, the Boccard teams were entrusted with the realization of the Turbine and Steam Cycle lot.

Modular oxidant skid for the production of hair care products in Russia
Design and manufacture of a modular oxidizer skid for the production of shampoos, hair conditioners and hair colorings in Russia.

Workshop for the purification of animal oil for Omega 3
Novasep, a service provider in the field of production and purification of molecules for the life sciences and the chemical industry, turned to Boccard for the development and industrialization of its processes to obtain new molecules. Boccard designed, constructed and commissioned this workshop in the largest chromatography purification plant in the world.

Soap manufacturing unit
In order to increase its production capacities, this company requested Boccard’s expertise to create a new automated production unit for anioxide soap.

RMH: Bangkok Complete raw material handling plant
A leading brewery sought to modernize its raw material logistics for barley and malt, aiming for high throughput and strict compliance with international standards.

RMH: Malting Project in Mexico
A global brewing leader launched a strategic investment in Mexico to strengthen its supply chain and sustainability goals. The initiative included a malting facility project designed to support local beer production and reduce dependency on imported malt.

Design and construction of a new factory dedicated to the production of hair care products in Egypt
For a new Greenfield factory located near Cairo, this cosmetics company called on Boccard for its expertise in cosmetic installations.

Turnkey cell culture plant in Malaysia
For this greenfield project, Boccard carried out the entire project with a “global contractor” approach, thus integrating civil engineering, clean rooms, as well as all production units.

Prefabrication of piping for the construction of an ethylene plant in the United States
Prefabrication of 3,000 tons of piping for the cooling system on this project to expand a petrochemical complex in Texas.

Expansion of the production capacities of a cosmetics factory
This plant-based cosmetics brand worked with Boccard to increase the production capacity of its factory in France.

Piping construction on an oil rig in Malaysia
This construction and installation project of 14,000 tons of piping mobilized up to 400 people for 20 months, including 800,000 hours of work without any accident.

Design and installation of a Greenfield greek yogurt factory in less than one year
Discover the success story of the Chobani yogurt plant in the United States. In less than a year, our teams designed, manufactured, installed and commissioned the world’s largest Greek yogurt plant, which was named “Plant of the Year”. A major greenfield factory project which

Restart of the Arcelor Mittal Galati blast furnace in Romania
The Romanian sheet and plate producer ArcelorMittal Galati has called on Boccard’s teams to restart its blast furnace number 5.
You have a project ?
Our Customers
They trust us











