Discover
Our achievements

Studies and construction of piping for the nuclear island of the Flamanville EPR
NUCLEAR Our teams of specialists in the nuclear sector have been commissioned to design and build the piping for the nuclear island outside the steam

RMH: Bangkok Complete raw material handling plant
A leading brewery sought to modernize its raw material logistics for barley and malt, aiming for high throughput and strict compliance with international standards.

Factory of prepared meals for babies
Boccard built a new baby food factory in record time. The entire system was automated.

Design, construction and commissioning of an injectables production unit
Boccard undertook the project to design and build a turnkey workshop fro injectables for a major player in the pharmaceutical markets

Turnkey plant for the production of carrot juice
Our teams designed an entire production line. A global approach taking into account the customer’s needs at each step, from the line design to its installation, including the employees training.

Restart of the Arcelor Mittal Galati blast furnace in Romania
The Romanian sheet and plate producer ArcelorMittal Galati has called on Boccard’s teams to restart its blast furnace number 5.

EPC contract in the Voltalia Cacao Biomass power plant, French Guiana
The EPC contract includes the engineering, procurement, construction and commissioning of the boiler island, the water/steam cycle including the turbine and its utilities, as well as the high and low voltage electrical equipment and control of the unit.

Prefabrication and installation of spools in record time for a refinery in Colombia
Our teams specialized in pipe prefabrication have produced more than 64,000 spools for a refinery in Colombia.

Dismantling of Superphénix NNS in Creys-Malville, France
The Boccard teams were involved in the design phase as well as in the studies and turnkey construction of two treatment lines designed to transform

Piping construction on an oil rig in Malaysia
This construction and installation project of 14,000 tons of piping mobilized up to 400 people for 20 months, including 800,000 hours of work without any accident.

Transfer and increase production capacity of 2 blood fractionation workshops
To increase its production capacity for plasma-derived drugs, LFB called on Boccard Health & Care.

Soap manufacturing unit
In order to increase its production capacities, this company requested Boccard’s expertise to create a new automated production unit for anioxide soap.
Complete continuous heat treatment unit for vegetable proteins
Boccard conceived a system that allows the continuous processing of the vegetable protein, a highly viscous material. The plant is now operating without production interruption, 24 hours a day, 7 days a week.

Increase production capacities in a recombinant protein production plant
Our expert teams in Pharma & Biotech designed and supplied a complete unit for the production of recombinant proteins to increase the production capacities of the Belgian site of one of the largest manufacturers and suppliers of products and services for genomics and proteomic,

Construction of a new brewhouse for the Abbey “Trappistes de Rochefort”
The Abbey “Trappistes de Rochefort” wanted to design and construct its new brewhouse. They trusted in the expertise of our Belgian teams from Meura: a company from Boccard dedicated to brewery, distillery and grain extract projects.

Workshop for the purification of animal oil for Omega 3
Novasep, a service provider in the field of production and purification of molecules for the life sciences and the chemical industry, turned to Boccard for the development and industrialization of its processes to obtain new molecules. Boccard designed, constructed and commissioned this workshop in the largest chromatography purification plant in the world.

Manufacturing of piping modules for the cryogenic lines of the Large Hadron Collider of the European Council for Nuclear Research in Switzerland
CERN’s Large Hadron Collider (LHC) is a 27 km ring, buried to a depth of 100 meters, near the French-Swiss border in Geneva. It is the most powerful particle accelerateur in the world.

R&D fermentation platform for the production of hyaluronic acid
Boccard carried out the design, manufacture, qualification and commissioning of a fermentation platform with a capacity of 1000L.

Piping of a microcrystalline cellulose manufacturing plant in Thailand
This company turned to Boccard for the piping package for its new microcrystalline cellulose (MCC) plant.

ATEX revamping of perfume manufacturing site
Upgrading to ATEX standards, revamping and extension of a perfume production unit on for a prestigious French perfume company.

Fermentation in Biotech: E. coli for Recombinant Protein at R&D and Pilot Scale
Discover how E. coli recombinant protein fermentation scale up moves from 5 L glass to a 30 L seed and 150 L main bioreactor, with inline pH/DO/glucose analytics, CIP/SIP and compact centrifuge, sonication and ultrafiltration. A temperature and pH controlled waste inactivation tank enables safe discharge in a limited space. With TEKINBIO™ and Track Advance, teams gain tighter control and traceable scale‑up for reliable industrialisation.
You have a project ?
Our Customers
They trust us











