Discover
Our achievements

Extension and revamping of a fresh cheese factory
Expanding a factory is limited by the space available. Our teams designed this new production line by rethinking the layout of the plant.

Transfer and increase production capacity of 2 blood fractionation workshops
To increase its production capacity for plasma-derived drugs, LFB called on Boccard Health & Care.

Manufacturing of piping modules for the cryogenic lines of the Large Hadron Collider of the European Council for Nuclear Research in Switzerland
CERN’s Large Hadron Collider (LHC) is a 27 km ring, buried to a depth of 100 meters, near the French-Swiss border in Geneva. It is the most powerful particle accelerateur in the world.

Piping construction on an oil rig in Malaysia
This construction and installation project of 14,000 tons of piping mobilized up to 400 people for 20 months, including 800,000 hours of work without any accident.

Construction of a new brewhouse for the Abbey “Trappistes de Rochefort”
The Abbey “Trappistes de Rochefort” wanted to design and construct its new brewhouse. They trusted in the expertise of our Belgian teams from Meura: a company from Boccard dedicated to brewery, distillery and grain extract projects.

Dismantling of Superphénix NNS in Creys-Malville, France
The Boccard teams were involved in the design phase as well as in the studies and turnkey construction of two treatment lines designed to transform

Complete technological system for water filtration in a food processing plant
In response to changes in sanitary standards, we intervened in our client’s plant to regulate its equipment rinsing system and the filtration of the water used.

Revamping of the SUEZ Rambervillers incineration unit (Vosges, France)
On this project, the Boccard teams were entrusted with the realization of the Turbine and Steam Cycle lot.

Restart of the Arcelor Mittal Galati blast furnace in Romania
The Romanian sheet and plate producer ArcelorMittal Galati has called on Boccard’s teams to restart its blast furnace number 5.

Soap manufacturing unit
In order to increase its production capacities, this company requested Boccard’s expertise to create a new automated production unit for anioxide soap.

Kvass extract production line for Coca-Cola in Ukraine
Coca-Cola’s R&D teams teamed up with our brewhouse experts to design a new technology for producing “Kvass” extracts in Ukraine. Coca-Cola’s R&D teams teamed up with our brewhouse experts to design a new technology for producing “Kvass” extracts in Ukraine.

Workshop for the purification of animal oil for Omega 3
Novasep, a service provider in the field of production and purification of molecules for the life sciences and the chemical industry, turned to Boccard for the development and industrialization of its processes to obtain new molecules. Boccard designed, constructed and commissioned this workshop in the largest chromatography purification plant in the world.

Shampoo and cream production unit in Argentina
Our teams designed, manufactured and installed a platform composed of two 20T reactors for the production of shampoos and creams for a factory in Argentina.

Increase production capacities in a recombinant protein production plant
Our expert teams in Pharma & Biotech designed and supplied a complete unit for the production of recombinant proteins to increase the production capacities of the Belgian site of one of the largest manufacturers and suppliers of products and services for genomics and proteomic,

Design and installation of a Greenfield greek yogurt factory in less than one year
Discover the success story of the Chobani yogurt plant in the United States. In less than a year, our teams designed, manufactured, installed and commissioned the world’s largest Greek yogurt plant, which was named “Plant of the Year”. A major greenfield factory project which

Studies of cooling circuits as part of the refurbishment of the B Arcelor Mittal blast furnace in Ghent, Belgium.
ArcelorMittal in Ghent has 2 blast furnaces which are the heart of their production The blast furnaces operate for 20 to 25 years, after which the refractory lining must be renewed. Today it is the turn of blast furnace B to undergo such an operation.

Design and construction of a new factory dedicated to the production of hair care products in Egypt
For a new Greenfield factory located near Cairo, this cosmetics company called on Boccard for its expertise in cosmetic installations.

Studies and construction of piping for the nuclear island of the Flamanville EPR
NUCLEAR Our teams of specialists in the nuclear sector have been commissioned to design and build the piping for the nuclear island outside the steam

Prefabrication and installation of spools in record time for a refinery in Colombia
Our teams specialized in pipe prefabrication have produced more than 64,000 spools for a refinery in Colombia.

Turnkey cell culture plant in Malaysia
For this greenfield project, Boccard carried out the entire project with a “global contractor” approach, thus integrating civil engineering, clean rooms, as well as all production units.

R&D fermentation platform for the production of hyaluronic acid
Boccard carried out the design, manufacture, qualification and commissioning of a fermentation platform with a capacity of 1000L.
You have a project ?
Our Customers
They trust us